JDM B20Vtec Build

We may earn a small commission from affiliate links and paid advertisements. Terms

Here ya go. Nothing major.

Just shooting FireBalls lol



He finally got it to where it would idle properly.

Turbo, manifold, and wastegate are installed. He still has to modify some piping and the downpipe and he still has to fix some wiring issues. But were a lot closer than we were 2 weeks ago.
 
Oh and the oil pan was cleaned and resealed with an oem gasket. And he fixed the oil feed line and return line. No more leaks thank God.
 
Thanks. Should be done soon.

I'm just glad I have a professional working on my car now. And he is taking his time and being very detail so nothing is missed.
 
He's got the turbo kit completely installed. Thats all finished. He still has to finish these things:

Installing gauges, calibrating wideband, fabricating the downpipe and dump tube, buttoning up the ecu wiring, installing front bumper, blinkers, skunk2 vtec casing and cover, front and rear strut tower bars and torque mounts.
 
I'm ganna have to start taking donations to get this thing finished lol.

He's already got $1600 in labor so that he's charging me for.

But in all honesty he probably has about $2400 in actual labor so I can't complain.

That wiring harness was a complete nightmare.

But he has all the electrical issues fixed and all the leaks fixed.
 
I need a new cam plug.

Skunk2 no longer makes them. However I saw a JDM brand cam plug that has 3 o-rings on it. Would that 1 work ok?

If not what do you recommend?
 
Here's some recent pics of the car
 

Attachments

  • Daniel_Alt_Wiring_14910033222361.jpg
    Daniel_Alt_Wiring_14910033222361.jpg
    526.1 KB · Views: 146
  • 20170403_155202_14912504793871.jpg
    20170403_155202_14912504793871.jpg
    486.8 KB · Views: 145
  • 20170403_161349_14912504795091.jpg
    20170403_161349_14912504795091.jpg
    459.9 KB · Views: 187
  • 20170403_161411_14912504796261.jpg
    20170403_161411_14912504796261.jpg
    335.6 KB · Views: 173
wastegate, downpipe, and dump tube finished.


The 3rd picture:

AC evaporator sealed off and cleaned up all the leaves and gunk under the battery tray.
 

Attachments

  • 20170404_214621_14913568149391.jpg
    20170404_214621_14913568149391.jpg
    499.3 KB · Views: 129
  • 20170404_214558_14913568146401.jpg
    20170404_214558_14913568146401.jpg
    594.3 KB · Views: 132
  • 20170404_220243_14913578309101.jpg
    20170404_220243_14913578309101.jpg
    485.5 KB · Views: 132
Man I don't even want to bring him up.

He's cost me so much money. I'm glad I ended it with him when I did.

Not to mention I had a skunk2 dual bend short shifter at his garage that mysteriously went missing.

He did give me the rest of all my other parts but still. $120 down the shitter.


He didn't do me any favors thats for sure.

But anyways it is what it is.

Car is done tomorrow.

I just got to pay Dustin, very large bill.

So ya I would want to do more than punch his dick. I'm certainly not going to give him a reach around thats for damn sure.
 
Ok Dustin is paid and I have a zero balance with him now.

He said he wants to keep it a couple more days and drive it some and make sure everything is good to go before I officially pick it up.

If things work out were ganna try to go tune it next weekend. If he's not too busy.

We already have the dyno picked out just got a make an appt once Dustin gives me the green light.

All the major stuff is done. They are just finishing up installing the gauges and wiring all the goodies in.

Man I am so excited I cannot wait.

Looking at a Tuesday or Wednesday pick up. Hopefully tune it that Thursday or Friday.

I'm just so happy that its done right and properly.

I feel like a kid on Christmas eve lol.
 
Back
Top