P Prowler Super Moderator Sep 19, 2004 #1 Tie bar is on, shifter is in (huge difference), hidden mount radar is almost installed, and frame locks are done. :woo: more pictures and details later
Tie bar is on, shifter is in (huge difference), hidden mount radar is almost installed, and frame locks are done. :woo: more pictures and details later
P Prowler Super Moderator Sep 20, 2004 #5 the headlights have been done for almost 3 months. but thx anyways =)