Well its been a while since I updated this thread, partly due to many summer obligations as well as a job change and late nights working in the kitchen and/or on school work. Regardless, for those that are Facebook friends, you've probably seen some of these photo's, but for those that have not, I'll detail the updates below:

Drywall started after all new electrical was ran. I had to put in a sub-panel to accommodate the new circuits that were required. Electrical inspection went okay, especially for a homeowner, he had to come back and check the fire caulk and the addition of one new circuit but that was it.

Electrical completed:
576488_10150805955118511_399175569_n.jpg


insulation, where none existed before :)
398997_10150806915948511_1303932801_n.jpg


380229_10150853257283511_1516470159_n.jpg


The drywall wasn't too bad, except for the ceiling where I went over the existing ceiling with 1/2" material. I decided to not take out the existing ceiling since its plaster and I already took out a total of 6 tons of material with the previous dumpster. It was simply an added expense that I didn't want to accommodate.

Its also great knowing people in the industry as I had farmed out the taping of the kitchen and dining room parts to a guy I knew. He does homes in Fairfield County, Ct. so his work is spot on and it showed in the final product. His price was cheap and I welcomed him to do the work since I can't stand taping.

250971_10150873015793511_1047821204_n.jpg


206168_10150881603138511_522635458_n.jpg


Walls and celing were primed and ready for paint:
282885_10150902341763511_1915710402_n.jpg


My wife painted the walls, I painted the ceiling. I can't stand painting.
599440_10150902343193511_847922780_n.jpg


521561_10150902490773511_328694322_n.jpg


After paint, I trimmed out the electrical and got plugs and lights working so I could stop using a jerry-rigged light at night. For the recessed lights, I opted for the LED's with matching trim ring. They're a little pricey ($50/ea) but pay for themselves since they'll last for 35-50k hours. CT also had a rebate on them so I got them for $19/ea.

552528_10150909430063511_116387490_n.jpg


Roughly in the same time, my wife and I picked out the flooring since we couldn't salvage anything from the original setup. We ended up with a pre-finished floor from lumber liquidators. 2 1/4" in a chocolate color, etc. Ended up needing 420 sq. ft. of the stuff which equated to about 1400 lbs of material brought in by yours truly.

539454_10150904872513511_1347750975_n.jpg


317942_10150904874073511_1808387725_n.jpg


Started laying the floor; 15lb. tar paper underneath for moisture control.

320373_10150939655808511_121601163_n.jpg


After the main kitchen/dining room floor was completed, it was time to start cabinet install. Knowing the house had settled, I knew I was going to have to shim pretty extensively, which isn't a problem due to toe kicks, scribing and scribe molding being used.

Cabs compared to paint color:
179594_10150902508333511_713881952_n.jpg


Upper cabinet start
532434_10150951412073511_2116659566_n.jpg


Added the others
396062_10150953272958511_1120576303_n.jpg


556624_10150953273978511_246585603_n.jpg


I did add a nailer to the top of the wall cabinets to accept the Crown molding that will be installed soon.

First cabinet in and level. Luckily the high spot was in this corner to start the install from.

396879_10150955533413511_1009956970_n.jpg


Taking shape:
217923_10150955535033511_1585434782_n.jpg


488094_10150961234733511_681111262_n.jpg


New peninsula/breakfast bar
217923_10150955535033511_1585434782_n.jpg


Stove & Micro installed:
179584_10150963470933511_914824121_n.jpg


Got boxes?
314053_10150958171538511_697608307_n.jpg


Yesterday, the granite guys came to install the granite we purchased:
264947_10150992223248511_314005092_n.jpg


Breakfast bar. Need to buy some stools.
313234_10150992228328511_2046466112_n.jpg


New faucet. Damn things are expensive.
395891_10150992226293511_464710340_n.jpg


From the old dining room looking into the kitchen:
386932_10150992224713511_701197423_n.jpg


So that's where we are today. I'm waiting for my plumber to get here to connect the sink (supply and drain) as well as rough in the laundry room closet for supply and drain. Once that is done, I can button up the walls in the mudroom area where our pantry, fridge and laundry room closet are.

Its definitely been a tough project to do solo but I think its coming out great. There's a lot of satisfaction doing this work yourself and its really not hard at all.

Hope you guys enjoy the udpate as much as I do.
 
Looking good. Can't tell from the pics if you used gfci outlets near the sink or not but I think that's code.

I noticed a couple electrical outlets above your uppers. Is that for accent light purposes down the road?
 
Thanks guys, a lot of hard work and sweat so far and a fair amount still yet to go but I couldn't be happier with the outcome thus far.

@B -- planning on a September party at some point :)
@D16 -- Definitely GFCI's, there on the wall with the stove and micro and feed downwards to the cabinet with the glass doors. Every other outlet is a circuit (Ct. code dictates two circuits for countertop outlets). So I have two GFCI's that feed normal 20amp plugs downstream.
 
is there a code book online? i have some ideas for stuff down the road, but i don't know if it's even legal to do or not. How do you find out?
 
not really unless you want to pay for it. Most of the stuff I did was just ask the building department. They have to provide it to you. There's some stuff on their website (e.g. sheds need to be "X" feet from the property lines).
 
Missed your other ? D16; yes there's a plug plus rg6/hdmi above he glass cabinet. I wired for led lighting and alo for. Small countertop tv :)
 
Another update, officially on the last phase of the project, trim work :)

Pantry/Fridge/Washer & Dryer Closet -- "The mudroom"
389540_10151102556938511_830474004_n.jpg


397333_10151107639678511_1503778968_n.jpg


580770_10151107639848511_895334539_n.jpg


521837_10151131262278511_1174762822_n.jpg


381955_10151131262438511_2019945574_n.jpg


Also installed a transfer switch for the generator I bought a week or so ago. The sub panel (top right) was installed by me as part of the renovation. This houses about 4 circuits in the kitchen.

12756_10151120406248511_2071923881_n.jpg
 
Punch list
Door / Window Trim
Bifold doors for Washer/Dryer Closet
Transition pieces in interior doorways
Upper Cabinet Crown Molding
Lower Cabinet Crown Molding
Touch up painting
Remaining Crown molding in dining room area
Under cabinet LED lighting
Tile backsplash (still undecided about this)
Decorate

Taking Thanksgiving & Christmas weeks off so I'll be done with it before the years out.
 