after putting off this project for a few....ehhhh....months....It's back on again.
I got the carb parts that were needed, and installed them already, it wants to rip, but there is just something that is not right.
So I called up Luis at
paradiseracing.com and told him about this project. He thinks it's just a timing issue, so I will look into it a little more, something like I have it set at 13-15 degrees for idle, and at WOT...there is no timing advance to help the engine get along with the A/F mixture...so I need to be at 35 degree at WOT...so....it will be looked into and re-done. He also has a head gasket FEDEXed to me, and it will be here tommorrow around noon, by then, I should have the head off and apart and ready to size it up. He thinks that I should really invest in his new ITB setup thats still in the R&D department at his shop...who know...maybe I can get it under a sponsership thing...he said for me to right up something along the lines of what done and give him more info on some stuff...meh...I wish...
But the dizzy o-ring, the rear main seal, and a new timing belt are here now. so hopefully...if I take a little time, and have a machine shop shave the head, and if the new Comet or Comtech head gasket alows enough room for the pistons, then I might deck the block a little....if time permits...and time is now running out. With more money dumped on more parts as I type this...the car is becomeing a money pit. The carb parts ran me $225, and the hg was a good $60 from Luis, and all the other parts was $150 but that also included enough parts to get the Z, the AE86, and the CRX up and running....so hopefully, in the next two weeks...I will have all 4 cars up and running and ready to be put to sleep for the winter....and the week after that is nothing but moveing and setting everything else 30 miles away.
Plus we have a mad end-of-the-year rush at work to get 8 more helicopters done and delivered....so I get mad OT if I want it....but I'm already on 1 month with no days off...and a little OT each day if I can squeeze it in. Too much shit to do...no time to do it, and a house to buy, and a dead back....but I got all the parts and tools to do it with

a few more 20 hour days and most of the stuff will get done.
Pics will follow when I have time to sit down again.
